JustinP
Senior Member
Not that I'm an expert, but I'd be surprised if this were cheaper per square foot than a board. It's much more time consuming to make something as large as this, and the risk of something going wrong is much larger (as are the costs if something does indeed go wrong).
Have to agree with that. Looks much harder and time consuming per square foot to make something like this. I'm sure the small stuff is already setup to produce quickly, jigs in place etc. Custom stuff requires custom tooling to be set up etc.