SOLD O1 Go-Mai 250mmX59mm Gyuto

Kitchen Knife Forums

Help Support Kitchen Knife Forums:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.

MSicardCutlery

Full-time Knifemaker-Canadian Mazaki
KKF Sponsor
Joined
Feb 28, 2022
Messages
2,261
Reaction score
6,659
Location
Canada
Hello Everyone,

It's here, it's finished, and does it ever shine! This blade is comprised of 5 layers, 2 layers each mild steel and 15n20 (nickel bearing high carbon steel) for the jacket and an O1 tool steel core. The handle is torrified and oil finished cherry. This is a heavier workhorse of a knife, quite forward balanced with a heavy distal taper that runs right past the neck. The spine and neck are well radiused and polished in the same fashion as the blade, and the core is readily discernable.

This blade constitutes a practice piece, and more variations will be along in the coming weeks with an Apex Ultra core.
  • Blade: 250mmx59mm O1 tool steel/15n20/mild steel go-mai (63hrc) 2k finish, etched and polished
  • Neck: 16mmx22mm
  • Handle: 123mm, tapering from 24mmx23mm to 21mmx20mm, torrified cherry, oil finished.
  • POB: 80mm from handle
  • Spine: 5.02mm at the neck, 3.18mm at halfway, 1.00mm 1cm from the tip
  • Grind: flat to convex RH bias
  • Weight: 273 grams
  • Relieved choil and spine
  • Edge: .1mm
Asking $550 $500 U.S + $25 U.S for shipping with insurance anywhere in North America. International will be in the ballpark of $50-$75 U.S depending on the area.


20220810_135948.jpg

20220810_140009.jpg

20220809_122937.jpg



20220810_140643.jpg

20220810_140155.jpg

20220810_140127.jpg

20220810_140557.jpg

Spine shot attached
 

Attachments

  • 20220810_140044.jpg
    20220810_140044.jpg
    1.2 MB
  • 20220810_140044.jpg
    20220810_140044.jpg
    1.2 MB
Last edited:
Thanks! The cladding line came out pretty dramatic on this one.
 
THIS IS THE WAY!

@MSicardCutlery is gonna have either a good chuckle or shart himself when he sees the spec sheet for that custom come in!
That could be the first project where I have to allocate for replacement wheel bearings in my quote...maybe a new motor, shop's getting a little old too....
 
Back
Top